With the first phase of the Brecksville Road resurfacing mostly finished, the city has announced that the third phase – from ...
A $4.8 million project to resurface the runway at LF Wade International Airport has been completed in less than three weeks. Crews laid down 2,500 tonnes of asphalt on 7,000 feet of runway — but ...
This section of roadway is located from Route CC to Route 32 in Licking. As construction is underway, flaggers will be present, and traffic will be guided through the work zone by a pilot car.
More than 1,700 people have signed a petition opposing plans to resurface a four-mile path in the Lake District with asphalt. The path along a former railway line between Keswick and Threlkeld has ...